{"id":333,"date":"2025-08-14T10:56:29","date_gmt":"2025-08-14T10:56:29","guid":{"rendered":"http:\/\/143.110.183.161\/palghartendar\/?page_id=333"},"modified":"2025-12-11T15:54:28","modified_gmt":"2025-12-11T10:24:28","slug":"ramai-awaas-yojana","status":"publish","type":"page","link":"https:\/\/pswada.zppalghar.gov.in\/en\/ramai-awaas-yojana\/","title":{"rendered":"Ramai Housing Scheme"},"content":{"rendered":"<section class=\"wpb-content-wrapper\"><div class=\"vc_row wpb_row vc_row-fluid\"><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<div class=\"switchViewHead\">\n<div class=\"row\"><\/div>\n<\/div>\n<div class=\"row\">\n<div class=\"col-xs-12\">\n<section class=\"wpb-content-wrapper\">\n<div class=\"vc_row wpb_row vc_row-fluid\">\n<div class=\"wpb_column vc_column_container vc_col-sm-12\">\n<div class=\"vc_column-inner\">\n<div class=\"wpb_wrapper\">\n<div class=\"wpb_text_column wpb_content_element\">\n<div class=\"wpb_wrapper\">\n<p><b>Scheme Details :-<\/b><\/p>\n<p><span style=\"font-weight: 400;\">1. The beneficiary should belong to a Scheduled Caste family below the poverty line.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">2. Disabled beneficiaries who are not below the poverty line, their disability should be more than 40% and their annual income should be up to one lakh.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">3. Beneficiaries should be selected from a permanent waiting list prepared on the basis of the Poor Household Census Survey.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">4. Must not have availed the benefit of this scheme before.<\/span><\/p>\n<p><span style=\"font-weight: 400;\"><strong>Grant and Benefits<\/strong> :- <\/span><\/p>\n<p><span style=\"font-weight: 400;\">1. Under this scheme, 100% subsidy is received from the State Government. A subsidy of Rs. 1,20,000\/- is provided for the construction of a new house. In this, the construction of the house should have a minimum area of \u200b\u200b269 square feet. The details of the distribution are as follows: <\/span><\/p>\n<p><span style=\"font-weight: 400;\">2. While sanctioning the house, the first installment is Rs. 15,000\/-, the second installment is Rs. 45,000\/-, the third installment is Rs. 40,000\/-, and the fourth installment is Rs. 20,000\/-. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">3. Toilets also have to be constructed during the construction of the house. <\/span><\/p>\n<p><span style=\"font-weight: 400;\">4. Shabari Tribal Gharkul Scheme Objective: <\/span><\/p>\n<ul>\n<li><span style=\"font-weight: 400;\">To improve the living standards of the Scheduled Tribes living below the poverty line in the state and to solve their housing problem, by constructing permanent houses on their own land or in place of mud houses in rural areas.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">Providing housing benefits to disabled beneficiaries from Scheduled Tribes who are not below the poverty line, whose disability is more than 40% and whose annual income is up to one lakh.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">It is necessary to install a toilet and a stove in the house.<\/span><\/li>\n<li><span style=\"font-weight: 400;\">\u00a0The beneficiary must have his own land for the construction of the house.<\/span><\/li>\n<\/ul>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div>\n<\/section>","protected":false},"excerpt":{"rendered":"\u092f\u094b\u091c\u0928\u0947\u091a\u093e \u0924\u092a\u0936\u0940\u0932 :- \u0967. \u0932\u093e\u092d\u093e\u0930\u094d\u0925\u0940 \u0905\u0928\u0941\u0938\u0942\u091a\u093f\u0924 \u091c\u093e\u0924\u0940\u0924\u0940\u0932 \u0926\u093e\u0930\u093f\u0926\u094d\u0930\u092f \u0930\u0947\u0937\u0947\u0916\u093e\u0932\u0940\u0932 \u0915\u0941\u091f\u0942\u0902\u092c\u093e\u0924\u0940\u0932 \u0905\u0938\u093e\u0935\u093e.\u00a0 \u0968.\u091c\u0947 \u0905\u092a\u0902\u0917 \u0932\u093e\u092d\u093e\u0930\u094d\u0925\u0940 \u0926\u093e\u0930\u093f\u0926\u094d\u0930 \u0930\u0947\u0937\u0947\u0916\u093e\u0932\u0940 \u0928\u093e\u0939\u0940\u0924, \u0924\u094d\u092f\u093e\u0902\u091a\u0947 \u0905\u092a\u0902\u0917\u0924\u094d\u0935 \u096a\u0966% \u092a\u0947\u0915\u094d\u0937\u093e \u0905\u0927\u093f\u0915 \u0905\u0938\u093e\u0935\u0947 \u0935 \u0935\u093e\u0930\u094d\u0937\u093f\u0915 \u0909\u0924\u094d\u092a\u0928\u094d\u0928 \u090f\u0915 \u0932\u093e\u0916\u093e\u092a\u0930\u094d\u092f\u0902\u0924 \u0905\u0938\u093e\u0935\u0947. \u0969. \u0932\u093e\u092d\u093e\u0930\u094d\u0925\u0940 \u0928\u093f\u0935\u0921 \u0926\u093e\u0930\u093f\u0926\u094d\u0930 \u0915\u0941\u091f\u0942\u0902\u092c \u0917\u0923\u0928\u093e \u0938\u0935\u094d\u0930\u094d\u0935\u094d\u0939\u0947\u0915\u094d\u0937\u0923\u093e\u091a\u094d\u092f\u093e \u0906\u0927\u093e\u0930\u0947 \u0924\u092f\u093e\u0930 \u0915\u0947\u0932\u0947\u0932\u094d\u092f\u093e \u0915\u093e\u092f\u092e \u0938\u094d\u0935\u0930\u0941\u092a\u0940 \u092a\u094d\u0930\u0924\u093f\u0915\u094d\u0937\u093e \u092f\u093e\u0926\u0940\u0924\u0942\u0928 \u0915\u0930\u093e\u0935\u0940. \u096a. \u092f\u093e\u092a\u0942\u0930\u094d\u0935\u0940 \u0938\u0926\u0930 \u092f\u094b\u091c\u0928\u0947\u091a\u093e \u0932\u093e\u092d \u0918\u0947\u0924\u0932\u0947\u0932\u093e \u0928\u0938\u093e\u0935\u093e. \u0905\u0928\u0941\u0926\u093e\u0928 \u0935 \u092b\u093e\u092f\u0926\u0947 :- [...]","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-333","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/pswada.zppalghar.gov.in\/en\/wp-json\/wp\/v2\/pages\/333","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pswada.zppalghar.gov.in\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/pswada.zppalghar.gov.in\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/pswada.zppalghar.gov.in\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/pswada.zppalghar.gov.in\/en\/wp-json\/wp\/v2\/comments?post=333"}],"version-history":[{"count":6,"href":"https:\/\/pswada.zppalghar.gov.in\/en\/wp-json\/wp\/v2\/pages\/333\/revisions"}],"predecessor-version":[{"id":1944,"href":"https:\/\/pswada.zppalghar.gov.in\/en\/wp-json\/wp\/v2\/pages\/333\/revisions\/1944"}],"wp:attachment":[{"href":"https:\/\/pswada.zppalghar.gov.in\/en\/wp-json\/wp\/v2\/media?parent=333"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}